+370 614 44888
info@bdt.lt
mobile toggle
mobile toggle

Installation of the base course and construction of Mockava Terminal railway track (2.4 km)

2019
Lazdijų raj.
Vilniaus BDT performed work at the Mockava terminal in Lazdijai District, where European and Russian railway tracks were built next to each other. 30,000 tons of gravel and sand were used for the 2.4 km railway branch.

Client - Mockavos terminalas, UAB